Parcel 06800.02950.00000

Owners

C F COUNTRY CREST ASSOCIATES LTD PTNRSHP
C/O CHURCHILL FORGE PROPERTIES
DBA COUNTRY CRESTS TOWNHOMES

129 NEWBURY ST FL 3
BOSTON, MA 02116-2928

Parcel Summary

Location 6500 EAST RIDGE RD
ODESSA
Use Code B1: Apartments
Tax District 007: COU ODE ECISD ECHD OC
Map Parcel 01
Acreage 11.2075
Block 28
Subdivision COUNTRY CLUB NORTH [06800]
PROTEST DEADLINE: 05/15/2025

File Protest for this Parcel

Preliminary Values

DIRECT_CAP 2025
Total Building Value$16,825,654
Total Land Value$1,420,662
Total Property Value$18,246,316
Special Use Appraisal$0
Cap Loss$0
Net Assessed Value$18,246,316

Value History

202420232022202120202019
Total Building Value$14,368,096$13,211,906$12,105,037$10,335,548$18,701,951$13,894,823
Total Land Value$1,420,662$1,420,662$1,244,910$1,244,910$981,282$981,282
Total Property Value$15,788,758$14,632,568$13,349,947$11,580,458$19,683,233$14,876,105
Special Use Appraisal$0$0$0$0$0$0
Cap Loss$0$0$0$0$0$0
Net Assessed Value$15,788,758$14,632,568$13,349,947$11,580,458$19,683,233$14,876,105

*Please contact your Appraisal District for more information on the valuation method used to arrive at your appraised value.

Buildings

Building # 1, Section # 5, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM08640$77,69019751975100.00%40.00%60.00%$46,614

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M640100%640

Building # 1, Section # 6, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM08640$77,69019751975100.00%40.00%60.00%$46,614

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M640100%640

Building # 1, Section # 7, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 1, REAL ESTATE - MAIN, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior WallsFRWOOD/METAL/BLOCK FRAME
FNFoundationSLCONCRETE SLAB
RCRoofingCSCOMP SHINGLES
IFFlooringSTDCARPET/TILE/WOOD/CONCRETE STAIN
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
RE_MAIN3,336100%3,336

Building # 1, Section # 14, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082662$323,14019751975100.00%40.00%60.00%$193,884

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M2,662100%2,662

Building # 1, Section # 15, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082662$323,14019751975100.00%40.00%60.00%$193,884

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M2,662100%2,662

Building # 1, Section # 20, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM085269$639,60419751975100.00%40.00%60.00%$383,762

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M5,269100%5,269

Building # 1, Section # 21, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM085269$639,60419751975100.00%40.00%60.00%$383,762

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M5,269100%5,269

Building # 1, Section # 26, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM085269$639,60419751975100.00%40.00%60.00%$383,762

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M5,269100%5,269

Building # 1, Section # 27, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM085269$639,60419751975100.00%40.00%60.00%$383,762

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M5,269100%5,269

Building # 1, Section # 38, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 39, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 32, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM085269$639,60419751975100.00%40.00%60.00%$383,762

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M5,269100%5,269

Building # 1, Section # 33, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM085269$639,60419751975100.00%40.00%60.00%$383,762

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M5,269100%5,269

Building # 1, Section # 46, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082662$323,14019751975100.00%40.00%60.00%$193,884

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M2,662100%2,662

Building # 1, Section # 47, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082662$323,14019751975100.00%40.00%60.00%$193,884

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M2,662100%2,662

Building # 1, Section # 51, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 52, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 64, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 65, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 72, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 73, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 80, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 81, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 59, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082662$323,14019751975100.00%40.00%60.00%$193,884

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M2,662100%2,662

Building # 1, Section # 60, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082662$323,14019751975100.00%40.00%60.00%$193,884

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M2,662100%2,662

Building # 1, Section # 88, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082662$323,14019751975100.00%40.00%60.00%$193,884

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M2,662100%2,662

Building # 1, Section # 89, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082662$323,14019751975100.00%40.00%60.00%$193,884

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M2,662100%2,662

Building # 1, Section # 98, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 99, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 106, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 107, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 114, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 115, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 122, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 123, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 93, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082662$323,14019751975100.00%40.00%60.00%$193,884

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M2,662100%2,662

Building # 1, Section # 94, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082662$323,14019751975100.00%40.00%60.00%$193,884

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M2,662100%2,662

Building # 1, Section # 130, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082662$323,14019751975100.00%40.00%60.00%$193,884

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M2,662100%2,662

Building # 1, Section # 131, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082662$323,14019751975100.00%40.00%60.00%$193,884

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M2,662100%2,662

Building # 1, Section # 135, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 136, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 143, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 144, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 151, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 152, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 163, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 164, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 159, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM085269$639,60419751975100.00%40.00%60.00%$383,762

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M5,269100%5,269

Building # 1, Section # 160, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM085269$639,60419751975100.00%40.00%60.00%$383,762

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M5,269100%5,269

Building # 1, Section # 171, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082662$323,14019751975100.00%40.00%60.00%$193,884

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M2,662100%2,662

Building # 1, Section # 172, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082662$323,14019751975100.00%40.00%60.00%$193,884

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M2,662100%2,662

Building # 1, Section # 176, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 177, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 184, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 185, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 192, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 193, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 200, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 201, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 208, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 209, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 210, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 211, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 212, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 213, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 232, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 233, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 234, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 235, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083336$404,95719751975100.00%40.00%60.00%$242,974

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
A53M3,336100%3,336

Building # 1, Section # 236, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 237, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 238, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 239, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 240, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 241, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 242, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 243, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 244, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 245, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 246, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 247, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 214, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 215, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 216, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 217, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 218, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 219, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 220, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 221, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 222, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 223, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 224, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 225, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 226, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 227, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 228, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 229, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 230, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 231, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 202, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 203, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 204, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 205, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 206, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 207, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 194, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 195, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 196, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 197, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 198, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 199, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 186, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 187, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 188, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 189, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 190, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 191, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 178, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 179, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 180, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 181, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 182, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 183, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 173, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M42$1,64219751975100.00%40.00%60.00%$985

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M42100%42

Building # 1, Section # 174, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M42$1,64219751975100.00%40.00%60.00%$985

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M42100%42

Building # 1, Section # 175, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M1520$59,43219751975100.00%40.00%60.00%$35,659

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M1,520100%1,520

Building # 1, Section # 161, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M273$10,67419751975100.00%40.00%60.00%$6,404

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M273100%273

Building # 1, Section # 162, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 165, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 166, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 167, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 168, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 169, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 170, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 153, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 154, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 155, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 156, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 157, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 158, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 145, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 146, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 147, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 148, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 149, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 150, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 137, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 138, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 139, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 140, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 141, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 142, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 132, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M1520$59,43219751975100.00%40.00%60.00%$35,659

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M1,520100%1,520

Building # 1, Section # 133, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M42$1,64219751975100.00%40.00%60.00%$985

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M42100%42

Building # 1, Section # 134, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M42$1,64219751975100.00%40.00%60.00%$985

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M42100%42

Building # 1, Section # 95, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M36$1,40819751975100.00%40.00%60.00%$845

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M36100%36

Building # 1, Section # 96, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M36$1,40819751975100.00%40.00%60.00%$845

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M36100%36

Building # 1, Section # 97, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M1520$59,43219751975100.00%40.00%60.00%$35,659

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M1,520100%1,520

Building # 1, Section # 124, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 125, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 126, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 127, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 128, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 129, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 116, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 117, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 118, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 119, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 120, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 121, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 108, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 109, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 110, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 111, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 112, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 113, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 100, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 101, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 102, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 103, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 104, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 105, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 90, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M42$1,64219751975100.00%40.00%60.00%$985

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M42100%42

Building # 1, Section # 91, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M42$1,64219751975100.00%40.00%60.00%$985

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M42100%42

Building # 1, Section # 92, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M1520$59,43219751975100.00%40.00%60.00%$35,659

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M1,520100%1,520

Building # 1, Section # 61, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M42$1,64219751975100.00%40.00%60.00%$985

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M42100%42

Building # 1, Section # 62, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M42$1,64219751975100.00%40.00%60.00%$985

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M42100%42

Building # 1, Section # 63, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M1520$59,43219751975100.00%40.00%60.00%$35,659

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M1,520100%1,520

Building # 1, Section # 82, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 83, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 84, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 85, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 86, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 87, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 74, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 75, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 76, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 77, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 78, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 79, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 66, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 67, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 68, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 69, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 70, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 71, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 53, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 54, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 55, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 56, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 57, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 58, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 48, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M42$1,64219751975100.00%40.00%60.00%$985

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M42100%42

Building # 1, Section # 49, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M42$1,64219751975100.00%40.00%60.00%$985

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M42100%42

Building # 1, Section # 50, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M1520$59,43219751975100.00%40.00%60.00%$35,659

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M1,520100%1,520

Building # 1, Section # 34, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M44$1,72019751975100.00%40.00%60.00%$1,032

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M44100%44

Building # 1, Section # 35, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M44$1,72019751975100.00%40.00%60.00%$1,032

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M44100%44

Building # 1, Section # 36, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M273$10,67419751975100.00%40.00%60.00%$6,404

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M273100%273

Building # 1, Section # 37, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 40, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 41, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 42, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 43, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 44, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 45, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 28, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M44$1,72019751975100.00%40.00%60.00%$1,032

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M44100%44

Building # 1, Section # 29, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M44$1,72019751975100.00%40.00%60.00%$1,032

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M44100%44

Building # 1, Section # 30, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M273$10,67419751975100.00%40.00%60.00%$6,404

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M273100%273

Building # 1, Section # 31, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 22, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M44$1,72019751975100.00%40.00%60.00%$1,032

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M44100%44

Building # 1, Section # 23, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M44$1,72019751975100.00%40.00%60.00%$1,032

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M44100%44

Building # 1, Section # 24, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M273$10,67419751975100.00%40.00%60.00%$6,404

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M273100%273

Building # 1, Section # 25, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 16, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M60$2,34619751975100.00%40.00%60.00%$1,408

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M60100%60

Building # 1, Section # 17, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M42$1,64219751975100.00%40.00%60.00%$985

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M42100%42

Building # 1, Section # 18, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M42$1,64219751975100.00%40.00%60.00%$985

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M42100%42

Building # 1, Section # 19, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M1520$59,43219751975100.00%40.00%60.00%$35,659

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M1,520100%1,520

Building # 1, Section # 2, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M100$3,91019821982100.00%35.00%65.00%$2,542

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M100100%100

Building # 1, Section # 8, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 9, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 10, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 11, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M54$2,11119751975100.00%40.00%60.00%$1,267

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M54100%54

Building # 1, Section # 12, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M252$9,85319751975100.00%40.00%60.00%$5,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M252100%252

Building # 1, Section # 13, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M2280$89,14819751975100.00%40.00%60.00%$53,489

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
CN1M2,280100%2,280

Building # 1, Section # 3, O53M - OFFICE, BRICK

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
O53MM011012$83,64219751975100.00%40.00%60.00%$50,185

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Subareas
TypeGross AreaPercent of BaseAdjusted Area
O53M1,012100%1,012

Building # 1, Section # 4, S72M - STORAGE

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
S72M700$15,02219751975100.00%40.00%60.00%$9,013

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Subareas
TypeGross AreaPercent of BaseAdjusted Area
S72M700100%700

Extra Features

*RCNLD: Replacement Cost New, Less Depreciation

CodeDescriptionLengthWidthUnitsUnit PriceAYBRepl Cost% Good ConditionDpr Value*Final Value
SW4SWIMMING POOL1.00$13,7702000$13,770100%$13,770$13,770
TN5TENNIS COURT1.00$25,5001975$25,500100%$25,500$25,500

Land Lines

CodeDescriptionZoneFrontDepthUnitsUnit TypeRateAcreageTotal AdjValue
COMMCOMMERCIALEF5.00.00488,200.00SF$2.9111.211.00$1,420,662

Personal Property

None

Notice of Value

2023
2024
2025

Jurisdiction Values & Tax Rates

Jurisdiction202420232022202120202019
CITY OF ODESSA$15,252,568
.004663
$71,118.91
0.00%
$14,632,568
.004838
$70,791.05
0.00%
$13,349,947
.004838
$64,585.84
0.00%
$11,580,458
.004771
$55,252.10
0.00%
$19,683,233
.004771
$93,911.66
0.00%
$14,876,105
.004766
$70,899.67
0.00%
ECTOR COUNTY$15,252,568
.003500
$53,383.99
0.00%
$14,632,568
.003500
$51,213.99
0.00%
$13,349,947
.003500
$46,724.81
0.00%
$11,580,458
.003650
$42,268.67
0.00%
$19,683,233
.003650
$71,843.80
0.00%
$14,876,105
.003650
$54,297.78
0.00%
ECTOR COUNTY I S D$15,252,568
.010140
$154,661.04
0.00%
$14,632,568
.010140
$148,374.24
0.00%
$13,349,947
.011779
$157,251.70
0.00%
$11,580,458
.011779
$136,408.53
0.00%
$19,683,233
.011779
$231,852.74
0.00%
$14,876,105
.011779
$175,228.62
0.00%
ECTOR CO HOSPITAL DIST$15,252,568
.001004
$15,309.46
0.00%
$14,632,568
.000887
$12,983.33
0.00%
$13,349,947
.001099
$14,677.07
0.00%
$11,580,458
.001500
$17,370.69
0.00%
$19,683,233
.001500
$29,524.85
0.00%
$14,876,105
.001127
$16,768.35
0.00%
ODESSA COLLEGE$15,252,568
.001769
$26,979.81
0.00%
$14,632,568
.001717
$25,119.14
0.00%
$13,349,947
.001886
$25,183.74
0.00%
$11,580,458
.002017
$23,360.45
0.00%
$19,683,233
.001890
$37,194.42
0.00%
$14,876,105
.001868
$27,787.08
0.00%
TOTAL CALCULATED TAX AMOUNT$321,453.21$308,481.75$308,423.16$274,660.44$464,327.47$344,981.50

Tax Collection for this Parcel

Disclaimer

The preliminary values listed above are a work in progress and are not certified as official.