Parcel 08960.00010.00000

Owners

SCP10 PARTNERS LP
DBA ALARA APARTMENTS

6502 SLIDE RD STE 403
LUBBOCK, TX 79424-1373

Parcel Summary

Location 6501 EAST RIDGE RD
ODESSA 79762
Use Code B1: Apartments
Tax District :
Map Parcel 01
Acreage 9.5498
Block 1
Last Sale Date 01/01/2021
Subdivision EASTRIDGE [08960]
PROTEST DEADLINE: 05/15/2025

Preliminary Values

SETTLED 2026
Total Building Value$10,874,291
Total Land Value$2,125,709
Total Property Value$13,000,000
Special Use Appraisal$0
Cap Loss$0
Net Assessed Value$13,000,000

Value History

2025 2024 2023 2022 2021 2020 2019
Total Building Value$10,874,291$11,183,366$7,374,291$7,169,260$9,213,485$13,089,469$9,899,469
Total Land Value$2,125,709$894,634$2,125,709$1,210,531$1,210,531$1,210,531$1,210,531
Total Property Value$13,000,000$12,078,000$9,500,000$8,379,791$10,424,016$14,300,000$11,110,000
Special Use Appraisal$0$0$0$0$0$0$0
Cap Loss$0$0$0$0$0$0$0
Net Assessed Value$13,000,000$12,078,000$9,500,000$8,379,791$10,424,016$14,300,000$11,110,000

*Please contact your Appraisal District for more information on the valuation method used to arrive at your appraised value.

Buildings

Building # 1, Section # 1, REAL ESTATE - MAIN, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior WallsFRWOOD/METAL/BLOCK FRAME
FNFoundationSLCONCRETE SLAB
RCRoofingCSCOMP SHINGLES
IFFlooringSTDCARPET/TILE/WOOD/CONCRETE STAIN
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
RE_MAIN1,176100%1,176

Building # 1, Section # 2, O13M - OFFICE, METAL/FRAME

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
O13MM142604$274,90419831983100.00%35.00%65.00%$178,688

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
O13M2,604100%2,604

Building # 1, Section # 3, L43M - LAUNDROMAT, FRAME

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
L43MM02540$11,53419831983100.00%35.00%65.00%$7,497

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
L43M540100%540

Building # 1, Section # 4, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M150$5,86519831983100.00%35.00%65.00%$3,812

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M150100%150

Building # 1, Section # 5, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M66$2,58119831983100.00%35.00%65.00%$1,678

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M66100%66

Building # 1, Section # 6, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 7, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 8, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 9, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 10, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 11, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 12, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 13, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082156$322,19319831983100.00%35.00%65.00%$209,425

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,156100%2,156

Building # 1, Section # 14, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082156$322,19319831983100.00%35.00%65.00%$209,425

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,156100%2,156

Building # 1, Section # 15, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082156$322,19319831983100.00%35.00%65.00%$209,425

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,156100%2,156

Building # 1, Section # 16, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082156$322,19319831983100.00%35.00%65.00%$209,425

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,156100%2,156

Building # 1, Section # 17, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 18, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 19, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 20, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 21, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 22, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 23, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 24, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 25, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 26, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 27, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 28, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 29, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 30, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 31, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 32, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 33, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 34, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 35, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 36, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082891$432,03119831983100.00%35.00%65.00%$280,820

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,891100%2,891

Building # 1, Section # 37, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082891$432,03119831983100.00%35.00%65.00%$280,820

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,891100%2,891

Building # 1, Section # 38, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082891$432,03119831983100.00%35.00%65.00%$280,820

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,891100%2,891

Building # 1, Section # 39, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082891$432,03119831983100.00%35.00%65.00%$280,820

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,891100%2,891

Building # 1, Section # 40, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 41, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 42, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 43, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 44, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 45, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 46, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 47, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 48, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 49, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 50, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 51, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 52, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 53, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 54, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 55, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 56, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082891$432,03119831983100.00%35.00%65.00%$280,820

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,891100%2,891

Building # 1, Section # 57, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082891$432,03119831983100.00%35.00%65.00%$280,820

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,891100%2,891

Building # 1, Section # 58, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 59, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 60, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 61, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 62, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 63, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 64, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 65, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 66, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 67, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 68, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 69, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 70, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 71, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081372$205,03219831983100.00%35.00%65.00%$133,271

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,372100%1,372

Building # 1, Section # 72, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082891$432,03119831983100.00%35.00%65.00%$280,820

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,891100%2,891

Building # 1, Section # 73, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082891$432,03119831983100.00%35.00%65.00%$280,820

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,891100%2,891

Building # 1, Section # 74, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082891$432,03119831983100.00%35.00%65.00%$280,820

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,891100%2,891

Building # 1, Section # 75, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082891$432,03119831983100.00%35.00%65.00%$280,820

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,891100%2,891

Building # 1, Section # 76, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082891$432,03119831983100.00%35.00%65.00%$280,820

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,891100%2,891

Building # 1, Section # 77, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082891$432,03119831983100.00%35.00%65.00%$280,820

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,891100%2,891

Building # 1, Section # 78, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082156$322,19319831983100.00%35.00%65.00%$209,425

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,156100%2,156

Building # 1, Section # 79, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082156$322,19319831983100.00%35.00%65.00%$209,425

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,156100%2,156

Building # 1, Section # 80, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 81, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 82, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 83, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 84, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 85, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 86, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 87, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 88, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 89, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 90, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 91, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 92, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 93, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 94, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 95, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 96, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 97, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 98, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 99, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 100, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 101, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 102, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 103, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 104, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 105, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 106, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 107, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 108, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 109, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 110, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 111, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 112, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 113, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 114, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 115, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 116, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 117, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 118, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 119, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 120, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 121, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082254$336,83819831983100.00%35.00%65.00%$218,945

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,254100%2,254

Building # 1, Section # 122, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 123, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 124, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 125, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 126, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 127, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 128, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 129, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM081176$175,74119831983100.00%35.00%65.00%$114,232

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M1,176100%1,176

Building # 1, Section # 130, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082156$322,19319831983100.00%35.00%65.00%$209,425

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,156100%2,156

Building # 1, Section # 131, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082156$322,19319831983100.00%35.00%65.00%$209,425

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,156100%2,156

Building # 1, Section # 132, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Building # 1, Section # 133, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082156$322,19319831983100.00%35.00%65.00%$209,425

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,156100%2,156

Building # 1, Section # 134, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082156$322,19319831983100.00%35.00%65.00%$209,425

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,156100%2,156

Building # 1, Section # 135, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082156$322,19319831983100.00%35.00%65.00%$209,425

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,156100%2,156

Building # 1, Section # 136, A52M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A52MM082156$322,19319831983100.00%35.00%65.00%$209,425

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A52M2,156100%2,156

Building # 1, Section # 137, CN1M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN1M392$15,32719831983100.00%35.00%65.00%$9,963

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN1M392100%392

Extra Features

*RCNLD: Replacement Cost New, Less Depreciation

CodeDescriptionLengthWidthUnitsUnit PriceAYBRepl Cost% Good ConditionDpr Value*Final Value
ASPMASPHALT308675.00$2.601980$802,55565%$521,661$521,661
SW4SWIMMING POOL1.00$13,500.002000$13,500100%$13,500$13,500
TN5TENNIS COURT1.00$25,000.001983$25,000100%$25,000$25,000

Land Lines

CodeDescriptionZoneFrontDepthUnitsUnit TypeRateAcreageTotal AdjValue
COMMCOMMERCIALEF5.00.00415,990.00SF$5.119.551.00$2,125,709

Personal Property

None

Notice of Value

2025
2024
2023

Jurisdiction Values & Tax Rates

(The total appraised value change since 2020 is -9.09%)
Jurisdiction202420232022202120202019
CITY OF ODESSA
Tax Value
Tax Rate
Tax
% Change
$12,078,000
.004663
$56,316.69
22.53%
$9,500,000
.004838
$45,960.15
13.37%
$8,379,791
.004838
$40,540.67
-18.49%
$10,424,016
.004771
$49,734.54
-27.10%
$14,300,000
.004771
$68,227.45
28.85%
$11,110,000
.004766
$52,950.37
30.25%
ECTOR COUNTY
Tax Value
Tax Rate
Tax
% Change
$12,078,000
.003500
$42,273.00
27.14%
$9,500,000
.003500
$33,250.00
13.37%
$8,379,791
.003500
$29,329.27
-22.91%
$10,424,016
.003650
$38,047.66
-27.10%
$14,300,000
.003650
$52,195.00
28.71%
$11,110,000
.003650
$40,551.50
19.75%
ECTOR COUNTY I S D
Tax Value
Tax Rate
Tax
% Change
$12,078,000
.010140
$122,470.92
27.14%
$9,500,000
.010140
$96,330.00
-2.41%
$8,379,791
.011779
$98,707.23
-19.61%
$10,424,016
.011779
$122,786.57
-27.10%
$14,300,000
.011779
$168,442.56
28.71%
$11,110,000
.011779
$130,866.91
19.90%
ECTOR CO HOSPITAL DIST
Tax Value
Tax Rate
Tax
% Change
$12,078,000
.001004
$12,123.05
43.82%
$9,500,000
.000887
$8,429.26
-8.51%
$8,379,791
.001099
$9,212.83
-41.08%
$10,424,016
.001500
$15,636.02
-27.10%
$14,300,000
.001500
$21,450.00
71.28%
$11,110,000
.001127
$12,523.19
30.25%
ODESSA COLLEGE
Tax Value
Tax Rate
Tax
% Change
$12,078,000
.001769
$21,364.41
31.00%
$9,500,000
.001717
$16,308.27
3.17%
$8,379,791
.001886
$15,807.89
-24.82%
$10,424,016
.002017
$21,027.64
-22.18%
$14,300,000
.001890
$27,022.00
30.21%
$11,110,000
.001868
$20,752.37
21.86%
TOTAL CALCULATED TAX AMOUNT$254,548.07$200,277.68$193,597.89$247,232.43$337,337.01$257,644.34

Tax Collection for this Parcel

Disclaimer

The preliminary values listed above are a work in progress and are not certified as official.