Parcel 11100.03424.00000

Owners

SANCHEZ JOSE R CARRILLO

4000 E BUTTERCUP DR
GARDENDALE, TX 79758-4716

Parcel Summary

Location 4000 E BUTTERCUP DR
Use Code A1: Single Family Residence
Tax District 002: COU ECISD ECHD OC
Map Parcel 10
Acreage 1.9300
Block 29
Last Sale Date 06/17/2024
Last Sale Instrument 2024-00010397
Subdivision GARDENDALE [11100]
PROTEST DEADLINE: 05/15/2025

File Protest for this Parcel

Preliminary Values

STANDARD 2025
Total Building Value$256,355
Total Land Value$74,823
Total Property Value$331,178
Special Use Appraisal$0
Cap Loss$0
Net Assessed Value$331,178

Value History

2024202320222021
Total Building Value$186,085$177,640$161,061$154,956
Total Land Value$53,805$42,876$42,876$22,485
Total Property Value$239,890$220,516$203,937$177,441
Special Use Appraisal$0$0$0$0
Cap Loss$0$0$0$0
Net Assessed Value$239,890$220,516$203,937$177,441

*Please contact your Appraisal District for more information on the valuation method used to arrive at your appraised value.

Buildings

Building # 1, Section # 1, REAL ESTATE - MAIN, BRICK

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
BR4MM013298$427,78419671967100.00%45.00%55.00%$235,281

Structural Elements

TypeDescriptionCodeDetails
EWExterior WallsBVBRICK/STONE/STUCCO VENEER
FNFoundationPBCRAWL SPACE/PIER AND BEAM
RCRoofingCSCOMP SHINGLES
IFFlooringSTDCARPET/TILE/WOOD/CONCRETE STAIN
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT
Sub Areas
TypeGross AreaPercent of BaseAdjusted Area
BR4M2,838100%2,838
RE_ADDL460100%460

Building # 1, Section # 2, FR4V - COVER, FRAME

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
FR4CM021200$21,31219671967100.00%45.00%55.00%$11,722

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Sub Areas
TypeGross AreaPercent of BaseAdjusted Area
FR4C1,200100%1,200

Building # 1, Section # 3, FR4C - COV PATIO, FRAME

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
FR4CM02464$8,24119671967100.00%45.00%55.00%$4,533

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Sub Areas
TypeGross AreaPercent of BaseAdjusted Area
FR4C464100%464

Building # 1, Section # 4, FR4C - COV PATIO, FRAME

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
FR4CM02258$4,58219671967100.00%45.00%55.00%$2,520

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Sub Areas
TypeGross AreaPercent of BaseAdjusted Area
FR4C258100%258

Building # 1, Section # 5, S22M - STORAGE

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
S22M288$2,55220002000100.00%25.00%75.00%$1,914

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Sub Areas
TypeGross AreaPercent of BaseAdjusted Area
S22M288100%288

Building # 1, Section # 6, S20M - STORAGE

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
S20M64$51320002000100.00%25.00%75.00%$385

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
Sub Areas
TypeGross AreaPercent of BaseAdjusted Area
S20M64100%64

Land Lines

CodeDescriptionZoneFrontDepthUnitsUnit TypeRateAcreageTotal AdjValue
RESRESIDENTIALEG1.00.0084,070.80SF$0.891.931.00$74,823

Personal Property

None

Notice of Value

2024
2023

Jurisdiction Values & Tax Rates

Jurisdiction202420232022
ECTOR COUNTY
Tax Value
Tax Rate
Gross Tax
% Change
$239,890
.003500
$839.62
0.00%
$220,516
.003500
$771.81
0.00%
$203,937
.003500
$713.78
0.00%
ECTOR COUNTY I S D
Tax Value
Tax Rate
Gross Tax
% Change
$239,890
.010140
$2,432.48
0.00%
$220,516
.010140
$2,236.03
0.00%
$203,937
.011779
$2,402.21
0.00%
ECTOR CO HOSPITAL DIST
Tax Value
Tax Rate
Gross Tax
% Change
$239,890
.001004
$240.78
0.00%
$220,516
.000887
$195.66
0.00%
$203,937
.001099
$224.21
0.00%
ODESSA COLLEGE
Tax Value
Tax Rate
Gross Tax
% Change
$239,890
.001769
$424.33
0.00%
$220,516
.001717
$378.55
0.00%
$203,937
.001886
$384.71
0.00%
TOTAL CALCULATED TAX AMOUNT$3,937.21$3,582.05$3,724.91

Tax Collection for this Parcel

Disclaimer

The preliminary values listed above are a work in progress and are not certified as official.