Parcel 36800.01460.00000

Owners

WEIDNER WALTER DEAN TR ETAL
DBA GOLDEN CREST APTS

9757 NE JUANITA DR STE 300
KIRKLAND, WA 98034-4291

Parcel Summary

Location 3939 TANGLEWOOD LN
ODESSA 79762
Use Code B1: Apartments
Tax District :
Map Parcel 01
Acreage 6.4583
Block 9
Last Sale Date 05/01/1997
Last Sale Instrument 1336/703
Subdivision WINWOOD [36800]
PROTEST DEADLINE: 05/15/2025

Preliminary Values

SETTLED 2026
Total Building Value$7,283,650
Total Land Value$1,566,964
Total Property Value$8,850,614
Special Use Appraisal$0
Cap Loss$0
Net Assessed Value$8,850,614

Value History

2025 2024 2023 2022 2021 2020 2019
Total Building Value$7,283,650$6,634,576$4,391,220$5,106,227$5,667,737$5,924,313$8,821,069
Total Land Value$1,566,964$1,566,964$1,566,964$1,077,463$1,077,463$818,647$818,647
Total Property Value$8,850,614$8,201,540$5,958,184$6,183,690$6,745,200$6,742,960$9,639,716
Special Use Appraisal$0$0$0$0$0$0$0
Cap Loss$0$0$0$0$0$0$0
Net Assessed Value$8,850,614$8,201,540$5,958,184$6,183,690$6,745,200$6,742,960$9,639,716

*Please contact your Appraisal District for more information on the valuation method used to arrive at your appraised value.

Buildings

Building # 1, Section # 1, REAL ESTATE - MAIN, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083112$377,76619711971100.00%45.00%55.00%$207,771

Structural Elements

TypeDescriptionCodeDetails
EWExterior WallsFRWOOD/METAL/BLOCK FRAME
FNFoundationSLCONCRETE SLAB
RCRoofingCSCOMP SHINGLES
IFFlooringSTDCARPET/TILE/WOOD/CONCRETE STAIN
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
RE_MAIN3,112100%3,112

Building # 1, Section # 2, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 3, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 4, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM0895226$11,559,48419711971100.00%45.00%55.00%$6,357,716

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
RE_MAIN95,226100%95,226

Building # 1, Section # 5, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM081800$218,50219711971100.00%45.00%55.00%$120,176

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
RE_MAIN1,800100%1,800

Building # 1, Section # 6, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM084640$563,25019711971100.00%45.00%55.00%$309,788

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
RE_MAIN4,640100%4,640

Building # 1, Section # 7, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M4840$117,90219711971100.00%45.00%55.00%$64,846

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
RE_MAIN4,840100%4,840

Building # 1, Section # 8, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 9, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM081904$231,12719711971100.00%45.00%55.00%$127,120

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M1,904100%1,904

Building # 1, Section # 10, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 11, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM081904$231,12719711971100.00%45.00%55.00%$127,120

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M1,904100%1,904

Building # 1, Section # 12, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM081904$231,12719711971100.00%45.00%55.00%$127,120

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M1,904100%1,904

Building # 1, Section # 13, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM081904$231,12719711971100.00%45.00%55.00%$127,120

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M1,904100%1,904

Building # 1, Section # 14, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 15, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM081904$231,12719711971100.00%45.00%55.00%$127,120

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M1,904100%1,904

Building # 1, Section # 16, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM081904$231,12719711971100.00%45.00%55.00%$127,120

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M1,904100%1,904

Building # 1, Section # 17, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 18, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M4066$99,04819711971100.00%45.00%55.00%$54,476

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M4,066100%4,066

Building # 1, Section # 19, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M3097$75,44319711971100.00%45.00%55.00%$41,494

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M3,097100%3,097

Building # 1, Section # 20, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M6517$158,75419711971100.00%45.00%55.00%$87,315

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M6,517100%6,517

Building # 1, Section # 21, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M1634$39,80419711971100.00%45.00%55.00%$21,892

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M1,634100%1,634

Building # 1, Section # 22, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM081656$201,02219711971100.00%45.00%55.00%$110,562

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M1,656100%1,656

Building # 1, Section # 23, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM081656$201,02219711971100.00%45.00%55.00%$110,562

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M1,656100%1,656

Building # 1, Section # 24, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 25, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M2413$58,78119711971100.00%45.00%55.00%$32,330

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M2,413100%2,413

Building # 1, Section # 26, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M1938$47,21019711971100.00%45.00%55.00%$25,966

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M1,938100%1,938

Building # 1, Section # 27, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM081904$231,12719711971100.00%45.00%55.00%$127,120

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M1,904100%1,904

Building # 1, Section # 28, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM081904$231,12719711971100.00%45.00%55.00%$127,120

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M1,904100%1,904

Building # 1, Section # 29, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 30, O53M - OFFICE, BRICK

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
O53MM011500$123,97519711971100.00%45.00%55.00%$68,186

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
O53M1,500100%1,500

Building # 1, Section # 31, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083112$377,76619711971100.00%45.00%55.00%$207,771

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M3,112100%3,112

Building # 1, Section # 32, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083112$377,76619711971100.00%45.00%55.00%$207,771

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M3,112100%3,112

Building # 1, Section # 33, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 34, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 35, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082608$316,58519711971100.00%45.00%55.00%$174,122

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M2,608100%2,608

Building # 1, Section # 36, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082608$316,58519711971100.00%45.00%55.00%$174,122

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M2,608100%2,608

Building # 1, Section # 37, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 38, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 39, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083112$377,76619711971100.00%45.00%55.00%$207,771

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M3,112100%3,112

Building # 1, Section # 40, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083112$377,76619711971100.00%45.00%55.00%$207,771

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M3,112100%3,112

Building # 1, Section # 41, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 42, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 43, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M2755$67,11219711971100.00%45.00%55.00%$36,912

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M2,755100%2,755

Building # 1, Section # 44, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M3363$81,92319711971100.00%45.00%55.00%$45,058

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M3,363100%3,363

Building # 1, Section # 45, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082608$316,58519711971100.00%45.00%55.00%$174,122

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M2,608100%2,608

Building # 1, Section # 46, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082608$316,58519711971100.00%45.00%55.00%$174,122

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M2,608100%2,608

Building # 1, Section # 47, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 48, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 49, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083112$377,76619711971100.00%45.00%55.00%$207,771

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M3,112100%3,112

Building # 1, Section # 50, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM083112$377,76619711971100.00%45.00%55.00%$207,771

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M3,112100%3,112

Building # 1, Section # 51, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 52, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 53, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082608$316,58519711971100.00%45.00%55.00%$174,122

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M2,608100%2,608

Building # 1, Section # 54, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082608$316,58519711971100.00%45.00%55.00%$174,122

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M2,608100%2,608

Building # 1, Section # 55, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 56, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 57, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082608$316,58519711971100.00%45.00%55.00%$174,122

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M2,608100%2,608

Building # 1, Section # 58, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082608$316,58519711971100.00%45.00%55.00%$174,122

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M2,608100%2,608

Building # 1, Section # 59, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 60, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 61, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M6498$158,29119711971100.00%45.00%55.00%$87,060

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M6,498100%6,498

Building # 1, Section # 62, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M4465$108,76719711971100.00%45.00%55.00%$59,822

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M4,465100%4,465

Building # 1, Section # 63, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082608$316,58519711971100.00%45.00%55.00%$174,122

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M2,608100%2,608

Building # 1, Section # 64, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082608$316,58519711971100.00%45.00%55.00%$174,122

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M2,608100%2,608

Building # 1, Section # 65, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 66, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 67, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082608$316,58519711971100.00%45.00%55.00%$174,122

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M2,608100%2,608

Building # 1, Section # 68, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082608$316,58519711971100.00%45.00%55.00%$174,122

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M2,608100%2,608

Building # 1, Section # 69, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 70, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 71, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082608$316,58519711971100.00%45.00%55.00%$174,122

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M2,608100%2,608

Building # 1, Section # 72, A53M - APARTMENT, BRICK VENEER

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
A53MM082608$316,58519711971100.00%45.00%55.00%$174,122

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
A53M2,608100%2,608

Building # 1, Section # 73, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Building # 1, Section # 74, CN6M - CANOPY

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
CN6M112$2,72819711971100.00%45.00%55.00%$1,500

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
CN6M112100%112

Extra Features

*RCNLD: Replacement Cost New, Less Depreciation

CodeDescriptionLengthWidthUnitsUnit PriceAYBRepl Cost% Good ConditionDpr Value*Final Value
SW8SWIMMING POOL1.00$30,000.002000$30,000100%$30,000$30,000

Land Lines

CodeDescriptionZoneFrontDepthUnitsUnit TypeRateAcreageTotal AdjValue
COMMCOMMERCIALED3.00.00281,322.00SF$5.576.461.00$1,566,964

Personal Property

None

Notice of Value

2025
2024
2023

Jurisdiction Values & Tax Rates

(The total appraised value change since 2020 is 31.26%)
Jurisdiction202420232022202120202019
CITY OF ODESSA
Tax Value
Tax Rate
Tax
% Change
$8,201,540
.004663
$38,241.73
32.67%
$5,958,184
.004838
$28,825.16
-3.65%
$6,183,690
.004838
$29,916.14
-7.04%
$6,745,200
.004771
$32,182.36
0.03%
$6,742,960
.004771
$32,171.67
-29.97%
$9,639,716
.004766
$45,942.98
114.22%
ECTOR COUNTY
Tax Value
Tax Rate
Tax
% Change
$8,201,540
.003500
$28,705.39
37.65%
$5,958,184
.003500
$20,853.64
-3.65%
$6,183,690
.003500
$21,642.92
-12.09%
$6,745,200
.003650
$24,619.98
0.03%
$6,742,960
.003650
$24,611.80
-30.05%
$9,639,716
.003650
$35,184.96
96.95%
ECTOR COUNTY I S D
Tax Value
Tax Rate
Tax
% Change
$8,201,540
.010140
$83,163.62
37.65%
$5,958,184
.010140
$60,415.99
-17.06%
$6,183,690
.011779
$72,838.92
-8.32%
$6,745,200
.011779
$79,453.06
0.03%
$6,742,960
.011779
$79,426.67
-30.05%
$9,639,716
.011779
$113,548.14
97.20%
ECTOR CO HOSPITAL DIST
Tax Value
Tax Rate
Tax
% Change
$8,201,540
.001004
$8,232.13
55.72%
$5,958,184
.000887
$5,286.64
-22.24%
$6,183,690
.001099
$6,798.41
-32.81%
$6,745,200
.001500
$10,117.80
0.03%
$6,742,960
.001500
$10,114.44
-6.92%
$9,639,716
.001127
$10,865.89
114.22%
ODESSA COLLEGE
Tax Value
Tax Rate
Tax
% Change
$8,201,540
.001769
$14,507.46
41.84%
$5,958,184
.001717
$10,228.18
-12.32%
$6,183,690
.001886
$11,665.10
-14.27%
$6,745,200
.002017
$13,606.62
6.79%
$6,742,960
.001890
$12,741.83
-29.24%
$9,639,716
.001868
$18,006.03
100.41%
TOTAL CALCULATED TAX AMOUNT$172,850.33$125,609.61$142,861.49$159,979.82$159,066.41$223,548.00

Tax Collection for this Parcel

Disclaimer

The preliminary values listed above are a work in progress and are not certified as official.