Parcel BL400.34079.00000

Owners

LINK ENERGY PIPELINE LIMITED PARTNERSHIP

PO BOX 4648
HOUSTON, TX 77210-4648

Parcel Summary

Location W HWY 302
ODESSA 00000
Use Code J8: Other
Tax District :
Map Parcel 30
Acreage .0000
Subdivision SOUTH DIXIE TRACT
PROTEST DEADLINE: 05/15/2025

Preliminary Values

STANDARD 2026
Total Building Value$188,719
Total Land Value$0
Total Property Value$188,719
Special Use Appraisal$0
Cap Loss$0
Net Assessed Value$188,719

Value History

2025 2024 2023 2022 2021 2020 2019
Total Building Value$188,719$184,861$181,373$177,702$164,687$161,422$161,422
Total Land Value$0$0$0$0$0$0$0
Total Property Value$188,719$184,861$181,373$177,702$164,687$161,422$161,422
Special Use Appraisal$0$0$0$0$0$0$0
Cap Loss$0$0$0$0$0$0$0
Net Assessed Value$188,719$184,861$181,373$177,702$164,687$161,422$161,422

*Please contact your Appraisal District for more information on the valuation method used to arrive at your appraised value.

Buildings

Building # 1, Section # 1, REAL ESTATE - MAIN, METAL

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
O33MM031600$124,52819781978100.00%35.00%65.00%$80,943

Structural Elements

TypeDescriptionCodeDetails
EWExterior WallsBVBRICK/STONE/STUCCO VENEER
FNFoundationSLCONCRETE SLAB
RCRoofingCSCOMP SHINGLES
IFFlooringSTDCARPET/TILE/WOOD/CONCRETE STAIN
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
RE_MAIN1,600100%1,600

Building # 1, Section # 2, S22M - STORAGE

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
S22M160$1,41819781978100.00%35.00%65.00%$922

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
S22M160100%160

Building # 1, Section # 3, S22M - STORAGE

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
S22M200$1,77219781978100.00%35.00%65.00%$1,152

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
S22M200100%200

Building # 1, Section # 4, SM2M - MACH SHOP, METAL

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
SM2MM03960$59,05919781978100.00%35.00%65.00%$38,388

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
SM2M960100%960

Building # 1, Section # 5, SR2M - REPAIR SHOP, METAL

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
SR2MM032400$103,56019781978100.00%35.00%65.00%$67,314

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
SR2M2,400100%2,400

Land Lines

None

Personal Property

None

Notice of Value

2025
2024
2023

Jurisdiction Values & Tax Rates

(The total appraised value change since 2020 is 16.91%)
Jurisdiction202420232022202120202019
ECTOR COUNTY
Tax Value
Tax Rate
Tax
% Change
$184,861
.003500
$647.01
1.92%
$181,373
.003500
$634.81
2.07%
$177,702
.003500
$621.96
3.47%
$164,687
.003650
$601.11
2.02%
$161,422
.003650
$589.19
0.00%
$161,422
.003650
$589.19
6.82%
ECTOR COUNTY I S D
Tax Value
Tax Rate
Tax
% Change
$184,861
.010140
$1,874.49
1.92%
$181,373
.010140
$1,839.12
-12.14%
$177,702
.011779
$2,093.19
7.90%
$164,687
.011779
$1,939.88
2.02%
$161,422
.011779
$1,901.42
0.00%
$161,422
.011779
$1,901.42
6.95%
ECTOR CO HOSPITAL DIST
Tax Value
Tax Rate
Tax
% Change
$184,861
.001004
$185.55
15.30%
$181,373
.000887
$160.93
-17.63%
$177,702
.001099
$195.37
-20.91%
$164,687
.001500
$247.03
2.02%
$161,422
.001500
$242.13
33.08%
$161,422
.001127
$181.95
16.18%
ODESSA COLLEGE
Tax Value
Tax Rate
Tax
% Change
$184,861
.001769
$327.00
5.02%
$181,373
.001717
$311.36
-7.12%
$177,702
.001886
$335.22
0.91%
$164,687
.002017
$332.21
8.91%
$161,422
.001890
$305.03
1.16%
$161,422
.001868
$301.52
8.69%
TOTAL CALCULATED TAX AMOUNT$3,034.05$2,946.22$3,245.74$3,120.23$3,037.77$2,974.08

Tax Collection for this Parcel

Disclaimer

The preliminary values listed above are a work in progress and are not certified as official.