Parcel 16810.00010.43500

Owners

FRANCO ADRIAN T

418 S DAMASCUS AVE
ODESSA, TX 79763-8003

Parcel Summary

Location 418 S DAMASCUS AVE
ODESSA 79763
Use Code A1: Single Family Residence
Tax District :
Map Parcel 30
Acreage 2.1347
Block 4
Last Sale Date 03/05/2014
Last Sale Instrument 2014-00002769
Subdivision KNOX VILLAGE RANCHETTES PH 4 [16810]
Exemptions HS: Homestead (11.13(b)) (100%)
PROTEST DEADLINE: 05/15/2025

Preliminary Values

STANDARD 2026
Total Building Value$118,972
Total Land Value$66,022
Total Property Value$184,994
Special Use Appraisal$0
Cap Loss$0
Net Assessed Value$184,994

Value History

2025 2024 2023 2022 2021 2020 2019
Total Building Value$119,125$124,341$115,627$109,553$105,603$97,788$93,875
Total Land Value$66,022$47,424$47,424$47,424$24,177$24,177$24,177
Total Property Value$185,147$171,765$163,051$156,977$129,780$121,965$118,052
Special Use Appraisal$0$0$0$0$0$0$0
Cap Loss$0$0$6,017$14,219$0$0$0
Net Assessed Value$185,147$171,765$157,034$142,758$129,780$121,965$118,052

*Please contact your Appraisal District for more information on the valuation method used to arrive at your appraised value.

Buildings

Building # 1, Section # 1, REAL ESTATE - MAIN, FRAME

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
FR4MM021648$214,80019551955100.00%50.00%50.00%$107,400

Structural Elements

TypeDescriptionCodeDetails
EWExterior WallsFRWOOD/METAL/BLOCK FRAME
FNFoundationPBCRAWL SPACE/PIER AND BEAM
RCRoofingCSCOMP SHINGLES
IFFlooringSTDCARPET/TILE/WOOD/CONCRETE STAIN
FGHVACHVACCENTRAL AIR AND HEAT IN THE MAIN IMPROVEMENT

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
RE_MAIN1,648100%1,648

Building # 1, Section # 2, D30M - DET GARAGE, FRAME

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
D30MM02600$12,29419911991100.00%30.00%70.00%$8,606

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
D30M600100%600

Building # 1, Section # 3, SHNM - OPEN SHED, FRAME

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
SHNMM02300$1,38919911991100.00%30.00%70.00%$972

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
SHNM300100%300

Building # 1, Section # 4, FR2V - COVER, FRAME

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
FR2VM02480$3,06719901990100.00%35.00%65.00%$1,994

Structural Elements

TypeDescriptionCodeDetails
EWExterior Walls UNASSIGNED

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
FR2V480100%480

Land Lines

CodeDescriptionZoneFrontDepthUnitsUnit TypeRateAcreageTotal AdjValue
RESRESIDENTIALEW7299.00311.0092,989.00SF$0.712.131.00$66,022

Personal Property

None

Notice of Value

2025
2024
2023

Jurisdiction Values & Tax Rates

(The total appraised value change since 2020 is 51.80%)
Jurisdiction202420232022202120202019
ECTOR COUNTY
Tax Value
Tax Rate
Tax
% Change
$137,412
.003500
$480.94
9.38%
$125,627
.003500
$439.69
10.00%
$114,206
.003500
$399.72
5.48%
$103,824
.003650
$378.96
6.41%
$97,572
.003650
$356.14
3.32%
$94,442
.003650
$344.71
-0.62%
ECTOR COUNTY I S D
Tax Value
Tax Rate
Tax
% Change
$37,412
.010140
$379.36
45.99%
$25,627
.010140
$259.86
-70.27%
$74,206
.011779
$874.09
-5.86%
$78,824
.011779
$928.48
8.61%
$72,572
.011779
$854.84
4.51%
$69,442
.011779
$817.97
2.49%
ECTOR CO HOSPITAL DIST
Tax Value
Tax Rate
Tax
% Change
$154,588
.001004
$155.16
23.73%
$141,331
.000887
$125.40
-11.22%
$128,482
.001099
$141.25
-19.38%
$116,802
.001500
$175.20
6.41%
$109,768
.001500
$164.65
37.48%
$106,247
.001127
$119.76
8.10%
ODESSA COLLEGE
Tax Value
Tax Rate
Tax
% Change
$137,412
.001769
$243.06
12.71%
$125,627
.001717
$215.66
0.10%
$114,206
.001886
$215.44
2.86%
$103,824
.002017
$209.44
13.59%
$97,572
.001890
$184.38
4.52%
$94,442
.001868
$176.41
1.13%
TOTAL CALCULATED TAX AMOUNT$1,258.52$1,040.61$1,630.50$1,692.08$1,560.01$1,458.85

Tax Collection for this Parcel

Disclaimer

The preliminary values listed above are a work in progress and are not certified as official.